The Urban Planning Council approves the development of two buildings at 17 Massenet street, with 84 subsidized homes under the Young People's Affordable Housing Plan.
Calle Massenet, 17, in the Palma Palmilla district, will house two buildings with 84 subsidised homes. The Urban Planning Council has approved the layout proposal for the plot, promoted by Salas Promo Málaga S.A, on land with a maximum buildable area of 6,537.37 square metres.
The homes are part of the Young People's Affordable Housing Plan, presented on May 20, according to Málaga City Council. The development, awarded to Fundación Salas y Salas along with three others for the construction of homes or accommodation, is distributed as follows:
—51 one-bedroom homes, with a minimum usable area of 45 square metres.
—33 two-bedroom homes, with a usable area of around 60 square metres.
—Four homes adapted for people with reduced mobility, on the ground floor.
All the homes have a storage room. The complex is laid out in two staggered buildings adapted to the terrain's topography, with a maximum height of ground floor plus three floors and a penthouse in one of the blocks. On a one-off basis, the layout reaches ground floor plus four and plus five to adapt the volumes to the terrain conditions, something the file considers admissible due to the exceptional provision of the area's Partial Plan.
The project provides for 76 parking spaces for vehicles, plus four adapted spaces, seven for motorcycles, nine prepared for electric charging and 24 for bicycles. The common areas include a 520-square-metre central community square, landscaped green areas, a rest area and a children's playground.
The layout seeks to guarantee the building's landscape and functional compatibility with the Las Virreinas peri-urban park, by splitting the volume into two buildings, a central open space, the setback from Calle Massenet and the staggered adaptation to the slope.
A pedestrian street on the Mare Nostrum campus
The Urban Planning Council has also approved the urbanisation project for the Universidad Alfonso X El Sabio Mare Nostrum, which envisages a new public pedestrian street between Calle Jalón and Camino de la Térmica, as an extension of Calle Alicia Larrocha. The road will be 110 metres long and 17 metres wide.
In addition, the basic and execution project for the Centro district Operational Services building has been given the go-ahead, at Camino de los Almendrales, 15, on a plot of 670.72 square metres and two levels with offices, a meeting room, changing rooms, storerooms and a workshop. The execution period is estimated at 18 months and the budget is 951,587 euros, VAT included. The urbanisation works project for the perimeter roads of the Hermanas Hospitalarias care complex has also been approved.
Share this story
Breaking news from News, on your phone
An alert only when something can't wait. Free, no account needed.
On iPhone, alerts only arrive if you first add InforMálaga to your Home Screen.
How to do it, step by step
This browser can't receive alerts. Try another one, such as Chrome or Safari.
You've blocked alerts from InforMálaga in this browser. You can turn them back on in its settings.
How to do it, step by step