The Mancomunidad de la Costa del Sol distributes 7 million among eleven municipalities
The Assembly of the Mancomunidad de Municipios de la Costa del Sol Occidental approves an Investment Plan of 7.046.659,83 euros for works and supplies in eleven localities.
FJCG
·
Photo: Mancomunidad de Municipios de la Costa del Sol Occidental
Works on sports facilities, pedestrianisations, lifts and the purchase of vehicles and machinery for public services. This is what the 2026 Joint Investment Plan (PIM) will fund, approved by the Assembly of the Association of Municipalities of the Western Costa del Sol with an allocation of 7,046,659.83 euros to be distributed among the eleven municipalities that make it up.
The bulk of the money, 4,008,958.50 euros, will go to works. The largest items are the improvement of sports facilities in Marbella, with 1,788,142.46 euros, and the improvement of the roof of the Mijas sports centre, with 885,603.44 euros. Also to be funded are the pedestrianisation of the parking area in Manilva (308,476.66 euros), the undergrounding of recycling banks in Benahavís (292,214.80 euros), the improvement of the changing rooms at the Estepona athletics stadium (286,831.00 euros), the refurbishment of the Casares Tourist Office (253,690.14 euros) and the installation of a panoramic lift in Istán (194,000.00 euros).
Vehicles, machinery and beach equipment
The remaining 3,036,127.44 euros are allocated to supplies. Benalmádena will receive 705,897.50 euros for public service vehicles or machinery and a further 44,907.30 euros for machinery; Estepona, 558,601.60 euros for public service vehicles or machinery; Fuengirola, 99,825.00 euros for machinery, 282,355.45 euros for public service vehicles or machinery and 413,036.19 euros for beach equipment; Ojén, 144,232.00 euros for public service vehicles or machinery and 43,931.47 euros for machinery; and Torremolinos, 743,340.93 euros for play elements and complementary equipment.
The distribution combines a fixed sum per municipality, so that those with the smallest population and budget do not receive very small allocations, with the rest distributed according to each locality's participation coefficient in the entity under the current statutes. Each municipality has submitted an application with a maximum of two investment proposals, describing the needs to be covered and the objectives.
The president of the Association, Félix Romero, has stated that the plan "has been processed in a record time of two months" and that it will make it possible to mobilise resources towards the productive economy in areas such as the integral urban water cycle, urban solid waste management, beaches, the urban environment, tourism and the energy efficiency of vehicles and machinery. Romero explained that the initiative is funded from the treasury surplus obtained in the settlement of the 2025 General Budget, approved on March 20.
Share this story
Breaking news from News, on your phone
An alert only when something can't wait. Free, no account needed.
On iPhone, alerts only arrive if you first add InforMálaga to your Home Screen.
How to do it, step by step
This browser can't receive alerts. Try another one, such as Chrome or Safari.
You've blocked alerts from InforMálaga in this browser. You can turn them back on in its settings.
How to do it, step by step